The Turnkey Well Drilling and Facilities Project in PPL 239, Obira Field, offshore Nigeria, represents a groundbreaking collaboration between Obira Energy and Boron Oil and Gas Limited. This ambitious venture aims to deliver end-to-end solutions for well drilling, completion, engineering, procurement, surface facilities, installations, and marine logistics services in the prolific PPL 239 region. It embodies a commitment to excellence and sustainable energy development in the heart of Africa's oil and gas industry.
Project: Provision of Turnkey Well drilling, completion, engineering, procurement, surface facilities, installations, and marine logistics services in PPL 239, Obira field, offshore Nigeria.
Client: Obira Energy
Project Duration: 2023 on going
Project Goals:
The primary objective of Boron Oil and Gas Limited is to establish a state-of-the-art offshore drilling and production facility that operates in an environmentally responsible manner while maximizing resource extraction. This project is aligned with the global movement towards sustainable energy practices.
Project Scope:
Design and construction of an offshore drilling platform.
Implementation of advanced drilling techniques to minimize environmental impact.
Development of a comprehensive safety protocol.
Rigorous monitoring of emissions and waste disposal.
Integration of cutting-edge technology for reservoir management.
Project Stages:
1. Well Drilling and Completion:
The project commenced with well drilling and completion activities. Precision drilling techniques and real-time reservoir management were employed to optimize reservoir recovery while adhering to the highest safety and environmental standards.
2. Engineering and Procurement:
Following successful drilling, the focus shifted to engineering and procurement. This stage involved the sourcing, engineering, and procurement of state-of-the-art equipment, materials, and technologies to ensure the project's efficiency and cost-effectiveness.
3. Surface Facilities and Installations:
With drilling and procurement completed, the project moved into the design, construction, and maintenance of surface facilities and installations. These facilities were designed to withstand the challenges of the offshore environment, ensuring operational safety and longevity.
4. Marine Logistics:
Simultaneously, a well-coordinated marine logistics framework was established to efficiently transport personnel and equipment to and from the offshore location. This stage aimed to minimize downtime and resource wastage, optimizing project efficiency.
Conclusion
In conclusion, the Turnkey Well Drilling and Facilities Project in PPL 239, Obira Field, exemplifies the collaborative efforts of Obira Energy and Boron Oil and Gas Limited in pioneering sustainable and responsible energy production. This project showcases a commitment to excellence, innovation, and environmental stewardship in the dynamic world of offshore oil and gas exploration.
Project Overview
© 2024 Broronoilandgasltd. All Rights Reserved.
Company
About us
Our mission
Our value
QHSE Policies
Our assets
Career
Company
About us
Our mission
Our value
QHSE Policies
Our assets
Career
Services
Construction & Commissioning
Man Power Supply
Offshore Installations
Marine Assets
Subsea Engineering
Procurement Services
Projects
Provision of Turnkey Well drilling (OBIRA)
Provision of “ROV” services (SHELL)
Provision of 75t - 85t anchor handling vessels (NPDC)
Provision of Platform supply Vessel services - BOURBON HIDRA (Chevron)
Plot 15, block 110 Henry Ojogho Crescent, Lekki Phase 1, Lagos State
info@broronoilandgasltd.com
+234.817.511.1000, +234.1.454.4250
Company
About us
Our mission
Our value
QHSE Policies
Our assets
Career
Company
About us
Our mission
Our value
QHSE Policies
Our assets
Career
Services
Construction & Commissioning
Man Power Supply
Offshore Installations
Marine Assets
Subsea Engineering
Procurement Services
Projects
Provision of Turnkey Well drilling (OBIRA)
Provision of “ROV” services (SHELL)
Provision of 75t - 85t anchor handling vessels (NPDC)
Provision of Platform supply Vessel services - BOURBON HIDRA (Chevron)
Plot 15, block 110 Henry Ojogho Crescent, Lekki Phase 1, Lagos State
info@broronoilandgasltd.com
+234.817.511.1000, +234.1.454.4250
The Turnkey Well Drilling and Facilities Project in PPL 239, Obira Field, offshore Nigeria, represents a groundbreaking collaboration between Obira Energy and Boron Oil and Gas Limited. This ambitious venture aims to deliver end-to-end solutions for well drilling, completion, engineering, procurement, surface facilities, installations, and marine logistics services in the prolific PPL 239 region. It embodies a commitment to excellence and sustainable energy development in the heart of Africa's oil and gas industry.
Project: Provision of Turnkey Well drilling, completion, engineering, procurement, surface facilities, installations, and marine logistics services in PPL 239, Obira field, offshore Nigeria.
Client: Obira Energy
Project Duration: 2023 on going
Project Goals:
The primary objective of Boron Oil and Gas Limited is to establish a state-of-the-art offshore drilling and production facility that operates in an environmentally responsible manner while maximizing resource extraction. This project is aligned with the global movement towards sustainable energy practices.
Project Scope:
Design and construction of an offshore drilling platform.
Implementation of advanced drilling techniques to minimize environmental impact.
Development of a comprehensive safety protocol.
Rigorous monitoring of emissions and waste disposal.
Integration of cutting-edge technology for reservoir management.
Project Stages:
1. Well Drilling and Completion:
The project commenced with well drilling and completion activities. Precision drilling techniques and real-time reservoir management were employed to optimize reservoir recovery while adhering to the highest safety and environmental standards.
2. Engineering and Procurement:
Following successful drilling, the focus shifted to engineering and procurement. This stage involved the sourcing, engineering, and procurement of state-of-the-art equipment, materials, and technologies to ensure the project's efficiency and cost-effectiveness.
3. Surface Facilities and Installations:
With drilling and procurement completed, the project moved into the design, construction, and maintenance of surface facilities and installations. These facilities were designed to withstand the challenges of the offshore environment, ensuring operational safety and longevity.
4. Marine Logistics:
Simultaneously, a well-coordinated marine logistics framework was established to efficiently transport personnel and equipment to and from the offshore location. This stage aimed to minimize downtime and resource wastage, optimizing project efficiency.
Conclusion
In conclusion, the Turnkey Well Drilling and Facilities Project in PPL 239, Obira Field, exemplifies the collaborative efforts of Obira Energy and Boron Oil and Gas Limited in pioneering sustainable and responsible energy production. This project showcases a commitment to excellence, innovation, and environmental stewardship in the dynamic world of offshore oil and gas exploration.
Project Overview
The Turnkey Well Drilling and Facilities Project in PPL 239, Obira Field, offshore Nigeria, represents a groundbreaking collaboration between Obira Energy and Boron Oil and Gas Limited. This ambitious venture aims to deliver end-to-end solutions for well drilling, completion, engineering, procurement, surface facilities, installations, and marine logistics services in the prolific PPL 239 region. It embodies a commitment to excellence and sustainable energy development in the heart of Africa's oil and gas industry.
Project: Provision of Turnkey Well drilling, completion, engineering, procurement, surface facilities, installations, and marine logistics services in PPL 239, Obira field, offshore Nigeria.
Client: Obira Energy
Project Duration: 2023 on going
Project Goals:
The primary objective of Boron Oil and Gas Limited is to establish a state-of-the-art offshore drilling and production facility that operates in an environmentally responsible manner while maximizing resource extraction. This project is aligned with the global movement towards sustainable energy practices.
Project Scope:
Design and construction of an offshore drilling platform.
Implementation of advanced drilling techniques to minimize environmental impact.
Development of a comprehensive safety protocol.
Rigorous monitoring of emissions and waste disposal.
Integration of cutting-edge technology for reservoir management.
Project Stages:
1. Well Drilling and Completion:
The project commenced with well drilling and completion activities. Precision drilling techniques and real-time reservoir management were employed to optimize reservoir recovery while adhering to the highest safety and environmental standards.
2. Engineering and Procurement:
Following successful drilling, the focus shifted to engineering and procurement. This stage involved the sourcing, engineering, and procurement of state-of-the-art equipment, materials, and technologies to ensure the project's efficiency and cost-effectiveness.
3. Surface Facilities and Installations:
With drilling and procurement completed, the project moved into the design, construction, and maintenance of surface facilities and installations. These facilities were designed to withstand the challenges of the offshore environment, ensuring operational safety and longevity.
4. Marine Logistics:
Simultaneously, a well-coordinated marine logistics framework was established to efficiently transport personnel and equipment to and from the offshore location. This stage aimed to minimize downtime and resource wastage, optimizing project efficiency.
Conclusion
In conclusion, the Turnkey Well Drilling and Facilities Project in PPL 239, Obira Field, exemplifies the collaborative efforts of Obira Energy and Boron Oil and Gas Limited in pioneering sustainable and responsible energy production. This project showcases a commitment to excellence, innovation, and environmental stewardship in the dynamic world of offshore oil and gas exploration.
Project Overview
Plot 15, block 110 henry ojogho crescent, lekki phase 1, lagos state
Company
About us
Our mission
Our value
QHSE Policies
Projects
Provision of Turnkey Well drilling (OBIRA)
Provision of “ROV” services (SHELL)
Provision of 75t - 85t anchor handling vessels (NPDC)
Provision of Platform supply Vessel services - BOURBON HIDRA (Chevron)
Services
Construction & Commissioning
Man Power Supply
Offshore Installations
Marine Assets
Subsea Engineering
info@broronoilandgasltd.com
+234.817.511.1000, +234.1.454.4250
Our assets
Career
Procurement Services
Plot 15, block 110 Henry Ojogho Crescent, Lekki Phase 1, Lagos State
Company
About us
Our mission
Our value
QHSE Policies
Projects
Provision of Turnkey Well drilling (OBIRA)
Provision of “ROV” services (SHELL)
Provision of 75t - 85t anchor handling vessels (NPDC)
Provision of Platform supply Vessel services - BOURBON HIDRA (Chevron)
Services
Construction & Commissioning
Man Power Supply
Offshore Installations
Marine Assets
Subsea Engineering
info@broronoilandgasltd.com
+234.817.511.1000, +234.1.454.4250
Our assets
Career
Procurement Services
© 2024 Broronoilandgasltd. All Rights Reserved.
Plot 15, block 110 Henry Ojogho Crescent, Lekki Phase 1, Lagos State
Company
About us
Our mission
Our value
QHSE Policies
Projects
Provision of Turnkey Well drilling (OBIRA)
Provision of “ROV” services (SHELL)
Provision of 75t - 85t anchor handling vessels (NPDC)
Provision of Platform supply Vessel services - BOURBON HIDRA (Chevron)
Services
Construction & Commissioning
Man Power Supply
Offshore Installations
Marine Assets
Subsea Engineering
info@broronoilandgasltd.com
+234.817.511.1000, +234.1.454.4250
Our assets
Career
Procurement Services
Plot 15, block 110 henry ojogho crescent, lekki phase 1, lagos state
Company
About us
Our mission
Our value
QHSE Policies
Projects
Provision of Turnkey Well drilling (OBIRA)
Provision of “ROV” services (SHELL)
Provision of 75t - 85t anchor handling vessels (NPDC)
Provision of Platform supply Vessel services - BOURBON HIDRA (Chevron)
Services
Construction & Commissioning
Man Power Supply
Offshore Installations
Marine Assets
Subsea Engineering
info@broronoilandgasltd.com
+234.817.511.1000, +234.1.454.4250
Our assets
Career
Procurement Services
Plot 15, block 110 Henry Ojogho Crescent, Lekki Phase 1, Lagos State
Company
About us
Our mission
Our value
QHSE Policies
Projects
Provision of Turnkey Well drilling (OBIRA)
Provision of “ROV” services (SHELL)
Provision of 75t - 85t anchor handling vessels (NPDC)
Provision of Platform supply Vessel services - BOURBON HIDRA (Chevron)
Services
Construction & Commissioning
Man Power Supply
Offshore Installations
Marine Assets
Subsea Engineering
info@broronoilandgasltd.com
+234.817.511.1000, +234.1.454.4250
Our assets
Career
Procurement Services
© 2024 Broronoilandgasltd. All Rights Reserved.
Plot 15, block 110 Henry Ojogho Crescent, Lekki Phase 1, Lagos State
Company
About us
Our mission
Our value
QHSE Policies
Projects
Provision of Turnkey Well drilling (OBIRA)
Provision of “ROV” services (SHELL)
Provision of 75t - 85t anchor handling vessels (NPDC)
Provision of Platform supply Vessel services - BOURBON HIDRA (Chevron)
Services
Construction & Commissioning
Man Power Supply
Offshore Installations
Marine Assets
Subsea Engineering
info@broronoilandgasltd.com
+234.817.511.1000, +234.1.454.4250
Our assets
Career
Procurement Services
Our assets
Our services
Projects
Our assets
Contact us
© 2024 Broronoilandgasltd. All Rights Reserved.